Drainage Fahrweid

Project

The Fahrweid drainage project was drawn up in order to reduce the flooding problem in the entire Fahrweid neighborhood. This area includes two municipalities: Geroldswil and Weiningen. According to this project, the following construction projects must be realized to eliminate thist specific flooding problem:

– Replacement and enlargement of the municipal sewers in Fahrweidstrasse and Austrasse (owned by the municipalities Geroldswil and Weiningen);

– Replacement and enlargement of the main sewer from Fahrweidstrasse to the “Länggenbach” pumping station (owned by Limeco);

– Renovation and expansion of the “Länggenbach” pumping station (owned by Limeco).

Specifications

Extension of the main sewer to 1.40m by means of microtunneling.

Performance

Overall site management in the realization phase for the “microtunneling” subsection

Contact Go Bau AG

Marc Reinhard: marc.reinhard@gobau.ch

Project Organisation

Builder

Waste water association Limeco
Municipality Geroldswil
Municipality Weinigen

Facts

Phases: SIA 52 + 53
Realization: 2019 – Spring 2021
Construction Loan: CHF 17.1 Mio.