Renewal Power Station Luchsingen (GL)
Project
The Luchsingen small hydropower plant was renovated. At the same time, the power plant’s electricity production had to be increased by one fifth through the connection of new spring catchments and the expansion of power plant infrastructures.
Specifications
Power plant infrastructures are characterized by a high examination rate of corrosion protection coatings, the distribution of components over long distances as well as a difficult accessibility due to the ongoing operation.
Performance
Go Bau AG was commissioned with the determination of building contaminants (building check) and the preparation of a disposal concept.